Government Projects

Project Name: FTLB Mechanical Upgrades Project

Location: National Renewable Energy Laboratory (NREL)

Project Description:

Installation of six, 4 million BTU Fulton boilers and one, 450 Ton McQuay chiller. Demolition of four existing boilers and installation of the new boilers to maintain heating requirements for the occupied facility. Electrical power modifications in the MCC and emergency MCC. New DDC for the controlling and sequencing of new boilers and chiller. Old concrete equipment pads were removed and new pads installed, as well as concrete cuts for in-floor trench drains. Additional pumps and piping were installed to tie the increased capacity of the boilers to the site infrastructure for heating capabilities to other buildings. Roof patching and lighting protection upgrades were included. Replaced an AHU with 52,000 CFM Air Handling Unit requiring the installation and operation of a temporary 40,000 CFM air handling unit. AHU replacement work required cutting a large opening in the exterior of the building at the second story. Lastly, the fire protection system was revised for the new equipment.

Contract Number: AGM-1-114223-01

Contract Amount: $2,315,021.00

Timeliness: Completed

Client Name: National Renewable Energy Laboratory (NREL)

Highlighted Government Projects:

Project Name: Bennett TI BOR Consolidation
Location: GSA Denver, CO
Final Contract Amount: $2,891,952.00

Project Name: NREL South Table Mountain Campus Electrical Upgrade
Location: NREL Golden, CO
Final Contract Amount: $2,617,312.00

Project Name: David Skaggs R&D Computer Room
Location: NOAA Boulder, CO
Final Contract Amount: $2,015,034.00

Project Name: Byron White Courthouse Energy Conservation Management (ECM)
Location: GSA Denver, CO
Final Contract Amount:  $1,825,147.00

Project Name: ECIP Project – Lighting, Controls, and Turbine Upgrade
Location: US Air Force Academy, CO
Final Contract Amount: $1,705,061.00

Project Name: DFC Energy Management Project – Bldgs. 48, 95, and 710
Location: GSA Lakewood, CO
Final Contract Amount: $1,280,154.00

Project Name: U.S. Air Force Academy Fire Alarm Upgrade Phase II
Location: U.S Air Force Academy Colorado Springs, CO
Final Contract Amount: $1,011,121.00

Project Name: Environmental Protection Agency (EPA) Building 25 Federal Center
Location: GSA Denver, CO
Final Contract Amount: $935,502.00

Project Name: David Skaggs – Garden Level Lab Build-Out
Location: NOAA Boulder, CO
Final Contract Amount: $867,618.00

Project Name: O’Mahoney 3rd Floor Tenant Finish
Location: GSA Cheyenne, WY
Final Contract Amount: $793,889.00

Project Name: NIST West Library Renovation
Location: NOAA/NIST Boulder, CO
Final Contract Amount: $622,641.00

Project Name: Tower Strobe Project
Location: NIST Fort Collins, CO
Final Contract Amount: $469,717.00

Project Name: NREL S&TF Process Development Integration Laboratory (PDIL) Cleanroom
Location: NREL – Lakewood, CO
Final Contract Amount:  $428,580.00

Project Name: NREL SERF & STF Vertex Heads
Location: NREL- Lakewood, CO
Final Contract Amount:  $347,390.00

Project Name: Building 95 Lab Upgrade
Location: GSA – Denver, CO
Final Contract Amount:  $292,797.00

Project Name: NREL Electrical Service Modification Project
Location: NREL National Wind Technology Center Boulder, CO
Final Contract Amount:  $262,325.00

Project Name: Occupancy Sensor Bldg 210
Location: Schriever AFB Colorado Springs, CO
Final Contract Amount:  $220,633.00

Project Name: NREL Thermal Test Facility (TTF) Service Upgrades
Location: NREL – Lakewood, CO
Final Contract Amount:  $152,268.00

Share This